Project Objectives

  • Improve safety and calm traffic along University Drive between Kenmore Drive and Fairfax Boulevard

  • Improve safety of pedestrian crosswalks

  • Improve pedestrian crossings and site

Project Description and Design Features

The project is located along University Dr. between Fairfax Blvd. and Layton Hall Drive. The project will improve safety by adding bulb outs at intersections, install sidewalk along the West side of University Dr. and narrow the lanes to slower speeds by adding chicanes. The University Boulevard Traffic Calming will take approximately 3 months to construct. The project will include:

  • 1200 lf of new curb and gutter

  • 1700 lf of new ADA sidewalks and associated handicap ramps

  • BMP/SWM rain gardens in each chicane island

  • New street lights

  • New landscaping and retaining walls

  • New driveway aprons